Rendering by:
Nelson Byrd Woltz
Master Plan and Phase One concept plan for a 600 acre property in Southeast Davidson County. The diverse demographics of the surrounding area create a distinctive opportunity to provide a park designed specifically as an inclusive space for all Nashvillians. The Mill Ridge Master Plan focused on creating an equitable public space that brings together the most diverse quadrant of Davidson County. Phase One includes a gathering lawn, pavilions, and a regional playground unlike any other in the Metro Park System.
On May 1, 2010 Tennessee experienced an extreme and unprecedented weather event that caused a historic flood in the Metro Nashville area. Through existing contracts, Metro Public Works (MPW) enlisted Collier Engineering to manage the Construction Engineering and Inspection (CEI) portion of the roadway repair projects necessitated by the flood. Collier along with Metro Public Works was recognized by the American Public Works Association (APWA) as the 2010 “Project of the Year”
“Collier Engineering can be relied upon for quality and professionalism whether managing large projects or providing surveying services. Sessions Paving Company looks forward to working with them in the future and would not hesitate to recommend them to others.”